Project Description
Investigate the condition of the selected railway route
between Mzenga station and Fuga station with total length
( 120.9 ) Km to performing a simulation in order to measure
elastic deflection of the existing structure (Bridges &
Culverts) beneath the track on the defined distance.
Value of Project: 1.2 billion USD
Project Details
CLIENT: El-Sewedy Electric T&D
LOCATION: Tanzania, Africa
PROJECT TYPE: Infrastructure
SCOPE OF WORK: Site Supervision
Scope of Work Details
Technical studies - Rehabilitation supervision -Testing and Commissioning - Maintenance supervision.
Project Gallery




×