City Drainage Network for Badia project.

New 6th of October City, Egypt | Infrastructure | Site Supervision

Project Description

  • Implementation works of the sewage line (slope) with a

     diameter of 900 mm from corrugated high-density

      polyethylene pipes H.D.P.E with a total length of 2280 linear

      meters with depths from 2 m to 5.6 m

  • Implementation works of 17 implements
  • Implementation works of the water line with a diameter of

     900 mm from GRP pipes with a hardness of 10000 Newton /

     m2 with a total length of 7400 linear meters

  • Implementation works of 6 air valve rooms
  • Implementation works of 5 lock and wash valve rooms
  • Connection to the transmission lines and the existing

      network in the 263-acre area.

Project Details

CLIENT: New Urban Communities Authority “NUCA”
LOCATION: New 6th of October City, Egypt
PROJECT TYPE: Infrastructure
SCOPE OF WORK: Site Supervision

Scope of Work Details

Implementation works of the sewage line (slope) with a diameter of 900 mm from corrugated high-density polyethylene pipes H.D.P.E