Project Description
- Implementation works of the sewage line (slope) with a
diameter of 900 mm from corrugated high-density
polyethylene pipes H.D.P.E with a total length of 2280 linear
meters with depths from 2 m to 5.6 m
- Implementation works of 17 implements
- Implementation works of the water line with a diameter of
900 mm from GRP pipes with a hardness of 10000 Newton /
m2 with a total length of 7400 linear meters
- Implementation works of 6 air valve rooms
- Implementation works of 5 lock and wash valve rooms
- Connection to the transmission lines and the existing
network in the 263-acre area.
Project Details
CLIENT: New Urban Communities Authority “NUCA”
LOCATION: New 6th of October City, Egypt
PROJECT TYPE: Infrastructure
SCOPE OF WORK: Site Supervision
Scope of Work Details
Implementation works of the sewage line (slope) with a diameter of 900 mm from corrugated high-density polyethylene pipes H.D.P.E