Value Engineering is a continuous and systematic process performed by a multi-disciplinary
team to improve the increase the value/money ration of the project. ECB’s team of qualified VE
professionals work collaboratively to achieve the lowest possible cost of a project keeping the
design intent and objective unchanged. Utilizing an integrated VE system will result in a
reduction of construction cost, improved functionality, better constructability, and early
identification of any risks or design problems.
ECB follows the SAVE international value methodology plan to achieve the required goals based on projects’ specific needs.