Project Description
1- Determining the alternatives to the path and studying them from a technical point of view.
2- Geotechnical and hydrological studies.
3- Design of the proposed track for the railway.
4- Structural design of industrial works.
5- Site supervision for construction.
Value of Project: 50 Million USD
Project Details
CLIENT: General Authority for Transportation projects planning
LOCATION: Port Said ,Egypt
PROJECT TYPE: Infrastructure
SCOPE OF WORK: Site Supervision
Scope of Work Details
Preparing Design and determining the Alignment distance from 30km to 44 km on the East Port Said Railway.
Project Gallery




×