Implementation works of the sewage line (slope) with adiameter of 900 mm from corrugated high-density
polyethylene pipes H.D.P.E with a total length of 2280 linearmeters with depths from 2 m to 5.6 m
Implementation works of 17 implementsImplementation works of the water line with a diameter of900 mm from GRP pipes with a hardness of 10000 Newton /m2 with a total length of 7400 linear meters
Implementation works of 6 air valve roomsImplementation works of 5 lock and wash valve rooms
Connection to the transmission lines and the existingnetwork in the 263-acre area.
+202 2401 3225
Info@ecb-consulting.com
LEONI - Badr City , Egypt.
Design and construction
Ministry of Military Production, Suez
Construction Management
ECB Scope: Steel Design